MDA History
Learn about the establishment, objectives, and achievements of Mardan Development Authority
Establishment of Mardan Development Authority
Housing is a basic need and thousands of families are struggling to have a roof over their heads. Rapid population growth, scarcity of Government resources, urbanization and the development imbalances between urban and rural areas have compounded the housing problem. In big Cities/Towns this problem has become further worsen.
Mardan Development Authority is now working under the Administrative control of Secretary Local Government, Elections and Rural Development Department, Government of Khyber Pakhtunkhwa.
Objectives
- Launching Sheikhmaltoon town Phase-IV
- External Electrification in SMT
- Arrangement for solid waste Management, Dumping Ground and Land fill
- Establishment Separate Grid Station
- Providing of sui Gas facility
- Development of new Tube Wells in existing networking
- Rehabilitation of existing water supply networking system
- Rehabilitation of sewerage system
- Construction of Roads/Rehabilitation of Roads
- Arrangement of Additional operational equipment/Machinery for efficient working
- Construction of Sewerage Treatment Plant (STP)
- Extension & strengthening of power supply (PESCO)
- Disposal of commercial plot/Construction of commercial plaza
- Disposal of non utility plots in education & health sector
- Disposal constructed shop/Flats
- Environmental Beautification
Achievements
MDA had developed three Phases of Sheikhmaltoon Town Swabi Mardan as per detail below:
Shah Mansoor Town Phase-I
Residential plots
2777 Nos
Commercial
154 kanal
Education
64 kanal
Health
6 kanal
Shah Mansoor Town Phase-II
Residential plots
1961 Nos
Commercial
15 kanal
Education
29.63 kanal
Health
2 kanal
Shah Mansoor Town Phase-III
Residential plots
501 Nos
Commercial
4.6 kanal
Education
4 kanal